Switchgear installations ready for use & in-process inspection
The OAS switchgear engineering department completely assembles switch and control cabinets according to the specifications by the design department and tests them when they are ready for operation – this allows for modifications during order processing, which can be handled as fast as possible with your special project in mind. Furthermore, the own in-process inspection ensures that all requirements by the customer and tests required by law have been realised as ordered. OAS customers get the opportunity to inspect the completely tested switch and control cabinets within the scope of a factory approval.
Assembly and consistent documentation
Upon delivery of the switch cabinets, a site manager by OAS supervises the electrical installation and installation in general. Installation itself is done by workforce of local companies or, upon request, by our team for electrical installation. When electrical installation is complete, any required test records are prepared before commissioning and stored with the documentation.
Qualified commissioning
OAS employees carry out commissioning in a qualified way – starting with a sense of rotation and signal test, through the adjustment and calibration of measuring points, ending with the cold performance test followed by a product run. In principle, the results are always recorded in corresponding logs and discussed and agreed with our customer. In this way, it is not only a high quality degree that we can guarantee, but also high availability and reliability of the line.